Almost done

New signworx shop

I can't believe it has been a month since my last post. I have been working two full time jobs so time has a way of blending into one long work day. We are almost ready to move Keene Signworx into the new shop but first...interior painting and trim. The boiler is now running which means the water is on. The permanent electrical hook up was installed late last week and most of the siding is on. With luck we will be moving over the holidays. I will have to think about designing a new sign.

Peter Poanessa